Construction quality inspection and defect management system

The specialist records the construction inspection or defect at a specific location. The contractor receives the repair task, and the responsible employee checks and accepts the result.

At the check or defect, the exact location of the work, the requirement, or the confirmation of the correction is missing. The work is noted finished without checking it, and when the structure is covered, the lack is made more difficult to find and remove.

How the solution works

  1. The work phase is determined by the required verification, admission criteria and validation right.
  2. The check is linked to the actual location and scope and records the result.
  3. Nonconformity receives responsible correction and effects on other work.
  4. The executor shall provide proof of rectification which the authorised examiner accepts or rejects.
  5. Confirmed correction is passed to work acceptance. Repeated causes of defects are reviewed by the team to avoid them in other jobs.

Key challenges

  • Defect process not linked to work

Solution capabilities

Checks before the next stage

The control point required has a clear criterion and impact on the follow-up work according to the quality plan applied.

Location and extent of non-compliance

The defect is associated with the room, zone, element or part of the works and the requirement applied at that time.

Correctional responsibility

Several contractor tasks may be assigned to eliminate one defect. The general case is closed after checking all necessary repairs.

Adoption of correction

The evidence presented and the authorized review are separated; an insufficient result is returned for replenishment.

Recurrence check

Related defects are examined according to the proven cause, the works performed and the conditions of use. A uniform name does not mean the same reason yet.

Business context

Defect process not linked to work
At the check or defect, the exact location of the work, the requirement, or the confirmation of the correction is missing. The work is noted finished without checking it, and when the structure is covered, the lack is made more difficult to find and remove.
The quality of the work is accepted according to the verified result
It is important to the customer that the promise of correcting the defect turns into a confirmed work at a specific location. The visible course of correction and acceptance allows for tracking incomplete issues. This facilitates the transfer of the object and the resolution of claims and helps the contractor to justify the quality of the work done.

Core features

  • Checks before the next stage
  • Location and extent of non-compliance
  • Correctional responsibility
  • Adoption of correction
  • Recurrence check

Key integrations

Project documents approved
The solution, specification and version required for specific verification are applicable.
Construction site work channel
Location, fact of performance and primary evidence of non-conformity.
Subcontractor workflow
Task assigned for correction, result presented and reviewer endorsement or notes.
Project work acceptance
Relevant verification clause, limitation and authorized quality approval.

Potential impact (%)

The ranges indicate an illustrative relative change in the metric under the stated assumptions. Results depend on the starting position and actual use of the solution. Percentages for different metrics must not be added together.

Waiting without a clear defect solution

6–25%Decreasing

This illustrative scenario assumes that 20-50% of waiting caused by missing information or unclear responsibility can be addressed. That share is assumed to fall by 30-50%. Company data is needed to verify both the addressable share and the resulting change.

Unexplained waiting between actions by cases of similar complexity is measured, while maintaining the necessary time for repair and testing.

Time of resubmission due to missing repair documents

12–36%Decreasing

This illustrative scenario assumes that 30-60% of manual data entry and handover work can be addressed. That share is assumed to fall by 40-60%. Company data is needed to verify both the addressable workload and the resulting change.

The work of replenishment and re-review of returned submissions is measured. Physical defect correction and newly identified defect work are not included.

Part of the explanation for the negative feedback on the correction of the defect

4–15%Decreasing

Indicative assumption: 15-30% of negative reviews relate to an unconfirmed defect elimination result. The solution could reduce this proportion by 25-50%. This is a scenario of potential; the assumptions need to be verified by feedback collected by the company.

When a company starts collecting reviews, negative reviews about the explanation for correcting the defect are counted from all assessments received on the subject. The same method of evaluation is applied before and after installation and similar customer groups are compared. Without initial data, the actual change is not determined.

Conditional calculation scenarios. The assumptions have not been validated against client measurements.

When this solution is relevant

  • The work is covered before the inspection imposed on it has been completed, as the plan does not see an unaccepted result.
  • The subcontractor notes the defect corrected, but the project team finds no proof of who and by what criterion they accepted it.

Project scope and implementation

The project can expand the existing construction management environment or develop a common tool for inspections and contractor work. The scope is determined by the work at the facility, access of participants, admission procedures and connection to the project documents. The need for an individual system is assessed by the functions that are lacking in the current environment.

Further development options

  • Relation of warranty cases to the same site of work and previous verification
  • Review of recurring causes for different projects by comparable type of work

Frequently asked questions

Adapting the solution to your business