Fleet maintenance management system

The Maintenance Coordinator prepares the repair task, appoints the principal and parts. Transport planners see the expected inaccessibility and approved return to work.

The need for maintenance by time, mileage, working hours or a reasonable condition attribute does not reach the task being prepared and performed in a timely manner. Technical work is delayed or started without preparation of parts, and if property is disturbed, additional waiting increases.

How the solution works

  1. The maintenance procedure or failure message applied determines the need for technical work.
  2. The responsible employee evaluates priority, required competence, share and asset unavailability.
  3. The internal team or external service accepts the task and provides a reasonable workflow.
  4. The actions performed, the parts used and the result of the check are recorded at the property.
  5. Confirmed returns reach operations, and a repeated attribute is linked to the previous job.

Key challenges

  • Maintenance is often only started when a fault occurs

Solution capabilities

The need by use

Planned works are based on property-specific requirements and a reliable usage indicator.

Fault assessment

The notified feature receives a technical assessment and restriction of use in accordance with the established responsibility.

Preparation of work and parts

The task has the executor, the necessary resources and the approval of the reservation or supply of parts.

External service run

The work transferred to the service, the changed deadlines and the result of the check are visible to the same asset unit.

Return and Recurrence

The work completed completes the required verification; the return of the same attribute allows viewing the result of the previous action.

Business context

Maintenance is often only started when a fault occurs
The need for maintenance by time, mileage, working hours or a reasonable condition attribute does not reach the task being prepared and performed in a timely manner. Technical work is delayed or started without preparation of parts, and if property is disturbed, additional waiting increases.
Repair progress is assessed in the customer order plan
Longer timed repairs can leave the planned work without transport. Prepared parts, service responses and return approval allow for a more accurate assessment of the inaccessibility. Planners can organize the change in time and avoid the service promise under an unapproved repair end.

Core features

  • The need by use
  • Fault assessment
  • Preparation of work and parts
  • External service run
  • Return and Recurrence

Key integrations

Fleet and operational processes
The need for maintenance of a specific unit of property, planned repair times and approved return to work.
Telematics or Usage Register
Reliable mileage, opening hours, and a condition signal is required for the specific inspection.
Reserve and Procurement System
Parts reservation, supply response and actual consumption.
External service channel
Reception of the work, changed course and proof of the action and verification carried out.

Potential impact (%)

The ranges indicate an illustrative relative change in the metric under the stated assumptions. Results depend on the starting position and actual use of the solution. Percentages for different metrics must not be added together.

Waiting for preparation in technical work

6–25%Decreasing

This illustrative scenario assumes that 20-50% of waiting caused by missing information or unclear responsibility can be addressed. That share is assumed to fall by 30-50%. Company data is needed to verify both the addressable share and the resulting change.

Additional waiting time is measured separately from the necessary repairs, inspection and part delivery time.

Recurrent Technical Disorders

2–12%Decreasing

This illustrative scenario assumes that 10-30% of the metric is attributable to addressable planning and execution shortcomings. That share is assumed to fall by 20-40%. Company data is needed to verify both the addressable share and the resulting change.

Comparisons are made between repetitions of the same reasonable cause by similar use of the property.

Conditional calculation scenarios. The assumptions have not been validated against client measurements.

When this solution is relevant

  • Planned work is registered but not prepared parts or unmatched reception of the principal.
  • After repairs, the same fault indication is repeated, but the specialist lacks previous work and verification results.

Implementation requirements

Approved requirements and reliable sources of mileage or hours of work are prepared for maintenance. Preparation of parts, acceptance of executors and verification of returns are combined with internal or external service and its actual responsibilities.

Further development options

  • Verification of the selected critical node status by a reasonable fault attribute
  • Comparison of outcomes and repetitions of external service work

Frequently asked questions

Adapting the solution to your business