Machinery and equipment quote configurator (CPQ)

The vendor forms a technically appropriate set of equipment and a bid. Non-standard preferences are evaluated by engineers, and approved changes are saved for the order.

Choices, technical exceptions, price, BOM, terms and approvals are documented. Proposals are prepared slowly, and changes after an order cause an unmanageable effect on production.

How the solution works

  1. The seller registers the terms of use and the modules chosen by the customer.
  2. Approved technical rules check the combination, and an undescribed exception is passed on to engineering.
  3. The commercial volume and verifiable basis for the term are calculated.
  4. The client approves a specific version of the offer.
  5. The configuration is transferred to engineering preparation and order, giving the result of acceptance.

Key challenges

  • Changes to customer configuration and order are managed by hand

Solution capabilities

Equipment assembly rules

Technical specialists approve the allowed combinations of modules and their conditions of use. The proposal is prepared according to the rules in force for a specific product.

Assessment of non-standard demand

A requirement not yet covered by the existing specifications is referred to a specialist, together with the customer's intended equipment operating conditions.

Price and commercial volume

Modules, additional preparation, services and exemptions are included under approved commercial rules.

Version and amendment of the proposal

Validation is linked to specific choices, price, and term conditions.

Transmission for product preparation

The sales configuration is transferred to prepare the technical structure, separating the already approved and yet-designed elements.

Business context

Changes to customer configuration and order are managed by hand
Choices, technical exceptions, price, BOM, terms and approvals are documented. Proposals are prepared slowly, and changes after an order cause an unmanageable effect on production.
The customer can compare the suitable sets for him
Individual equipment buyer evaluates features, accessories and total cost. Configuration rules allow to prepare a compatible offer and show alternative differences. The seller can reasonably discuss additional options, and non-standard choices before promising to pass on to the engineer for evaluation.

Core features

  • Equipment assembly rules
  • Assessment of non-standard demand
  • Price and commercial volume
  • Version and amendment of the proposal
  • Transmission for product preparation

Key integrations

Customer relationship management system (CRM)
Customer demand, sales opportunity and prepared offer.
Enterprise resource planning system (ERP)
Prices, Cost Elements, Terms and Commercial Rules.
Product Life Cycle Management System (PLM)
Permissible product structures, technical choices and released versions.
Intelligent Planning and Graphing System (APS)/Planning System
Preliminary term check by capacity and critical components.

Potential impact (%)

The ranges indicate an illustrative relative change in the metric under the stated assumptions. Results depend on the starting position and actual use of the solution. Percentages for different metrics must not be added together.

Technical harmonisation work on the proposal

12–36%Decreasing

This illustrative scenario assumes that 30-60% of manual data entry and handover work can be addressed. That share is assumed to fall by 40-60%. Company data is needed to verify both the addressable workload and the resulting change.

Compare sales and engineering time for similar offers of standard scope.

After-order determined excluded costs

3–14%Decreasing

This illustrative scenario assumes that 15-35% of cost variance can be explained and addressed using the measures described. That share is assumed to fall by 20-40%. Company data is needed to verify both the addressable share and the resulting change.

The missed costs and reasons are recorded, distinguishing the subsequent change in client volume.

Share of winning equipment project proposals

5–23%Increasing

Sample starting part - 30%. Assumption: 10-25% of the remaining cases involve prolonged combination of equipment set-up and price; a solution would help solve 20-40% of these cases.

The winning bids are divided by the total bids for comparable-purpose equipment projects. Together, the reasons for the win and the actual margin of the project are assessed.

Conditional calculation scenarios. The assumptions have not been validated against client measurements.

When this solution is relevant

  • The same standard choice is calculated or completed differently in different offers.
  • The proposal seems final, although there is no technical approval yet for the new client mode of operation.

Implementation requirements

For configuration, recurring modules, allowable combinations and the basis for calculating their cost are described. Technical specialists determine the approval of exceptions and changes to the order; the individual design part retains the engineer's decision.

Further development options

  • Review of the Impact of Client Choice Replacement
  • Analysis of the use errors in the Standard Module Rule

Frequently asked questions

Adapting the solution to your business