Metalworking manufacturing execution system (MES)
Operators record the time of metalworking, quantities produced and repairs. The master sees at which stage the order is placed and what hinders the continuation of work.
The total amount of cutting sheet or processing boot is not broken down into actual order fulfillment; partial transfers are recorded late. The planner sees inaccurate detail readiness and has to manually specify who can travel for the next operation.
How the solution works
- The workplace receives an approved assignment, a version of the document and published material.
- The operator begins the operation with a specific workpiece or identified group.
- The quantity produced, the time, the stop and the limitation of further work are recorded.
- The partial or full result is passed to the next stage with a surviving link between the material and the order.
Key challenges
- Production data is recorded too late
Solution capabilities
Operation Task
The operator sees the route stage assigned to him, documents and approved exceptions.
The relationship between blanks and quantity
Splitting or joining production groups preserves which material and details have gone into the next operation.
Working and stopping facts
Equipment time is tied to the order, and the reason is confirmed by an employee who understands the job.
Partial performance logging and conversion tasks
The right amount is separated from the pending check, rework or write-down; the next stage gets the actual state.
Business context
- Production data is recorded too late
- The total amount of cutting sheet or processing boot is not broken down into actual order fulfillment; partial transfers are recorded late. The planner sees inaccurate detail readiness and has to manually specify who can travel for the next operation.
- The cost of re-ordering is assessed by actual work
- In a metalworking order, profitability is determined by preparation, duration of operations and corrections. Linked work data allows for a more accurate estimation of the cost of a similar order. It is easier for the customer to explain the term or price change, and the sales team relies less on the previous approximate rate alone.
Core features
- Operation Task
- The relationship between blanks and quantity
- Working and stopping facts
- Partial performance logging and conversion tasks
Key integrations
- Enterprise resource planning system (ERP)
- Production orders, material requirements and return of actual data.
- Advanced planning and scheduling system (APS)
- The approved plan and the actual state of execution for replanning.
- Quality management system (QMS)
- Quality states, inspection tasks and detentions.
- Equipment data integration layer
- Reliable process and condition signals linked to the task, operation and time of work.
Potential impact (%)
The ranges indicate an illustrative relative change in the metric under the stated assumptions. Results depend on the starting position and actual use of the solution. Percentages for different metrics must not be added together.
Order status revision work
12–36%Decreasing
This illustrative scenario assumes that 30-60% of manual data entry and handover work can be addressed. That share is assumed to fall by 40-60%. Company data is needed to verify both the addressable workload and the resulting change.
The active time of planners and shop employees in search of the order status is measured.
Share of late-recorded operations
12–42%Decreasing
This illustrative scenario assumes that 30-60% of errors can be addressed through the data and rule checks described. That share is assumed to fall by 40-70%. Company data is needed to verify both the addressable share and the resulting change.
Calculates the proportion of operations whose entry is received later than the time required for the company to decide.
Conditional calculation scenarios. The assumptions have not been validated against client measurements.
When this solution is relevant
- Completion of a common cutting sheet or boot mistakenly closes an pending customer order.
- The amount returned by external processing does not match the work card, and the reason for the difference is not passed on to the planner.
Project scope and implementation
The project can add operator records and machine tool data to the production system used. The independent execution environment is defined by operations tracking, quantity control and repair tasks. Technological routes, materials and quality data are linked to the tools that maintain them.
Further development options
- Adding a Subcontractor Unit Return to the Route
- Verification of the unfinished production site against transmission records