Metalworking equipment maintenance system

The technical service plans the maintenance of machine tools, presses, cutting equipment and furnaces. The history of faults helps to prepare repairs and align the suspension with the production.

The fault is described without a specific node, conditions of use and the result of previous repairs; the parts needed are corrected after the device has stopped. The cause of the repeat malfunction remains unchecked, and avoidable waiting for preparation contributes to the necessary repairs.

How the solution works

  1. The fault is recorded at a specific node in the device and stopped works.
  2. The care coordinator combines time, specialist and availability of required parts.
  3. The action performed and the modified part are recorded in the node history.
  4. Once work capacity is confirmed, available capacity and remaining restrictions are returned to planning.

Key challenges

  • Maintenance is largely reactive

Solution capabilities

Device and node history

Critical nodes are associated with failure, load, repair and a sign of recurrence.

Planned works

Maintenance is planned according to the approved procedure, working time or reasonable condition signal.

Repair readiness

The necessary people, tools and parts are checked at the task, seeing the effect of the deficiency on the work.

Consumption of parts

The part used is linked to the repair, and the facts of the purchase and warehouse remain in their sources.

Validation of workability

Saves who and by which check allowed the device to be used again.

Business context

Maintenance is largely reactive
The fault is described without a specific node, conditions of use and the result of previous repairs; the parts needed are corrected after the device has stopped. The cause of the repeat malfunction remains unchecked, and avoidable waiting for preparation contributes to the necessary repairs.
Critical looms are evaluated before an order is accepted
When only one machine can perform the operation, its failure affects the customer's entire order. The visible course of maintenance and repair allows for an earlier recalculation of the production plan. The seller can discuss the term in time or, after considering the technical conditions, transfer of the works to the subcontractor.

Core features

  • Device and node history
  • Planned works
  • Repair readiness
  • Consumption of parts
  • Validation of workability

Key integrations

Metalworking manufacturing execution system (MES)
Actual opening hours, stops and related production orders.
Advanced planning and scheduling system (APS)
Maintenance windows and planned facility inaccessibility.
Enterprise resource planning system (ERP) / WMS
Spare parts, purchases and cost data.
Equipment data integration layer
Equipment status messages with device code, operating time and production task performed.

Potential impact (%)

The ranges indicate an illustrative relative change in the metric under the stated assumptions. Results depend on the starting position and actual use of the solution. Percentages for different metrics must not be added together.

Repeated downtimes due to the same node

2–12%Decreasing

This illustrative scenario assumes that 10-30% of the metric is attributable to addressable planning and execution shortcomings. That share is assumed to fall by 20-40%. Company data is needed to verify both the addressable share and the resulting change.

Repetition by working hours and history of a specific node is evaluated.

Repair waiting time due to missing part

6–25%Decreasing

This illustrative scenario assumes that 20-50% of waiting caused by missing information or unclear responsibility can be addressed. That share is assumed to fall by 30-50%. Company data is needed to verify both the addressable share and the resulting change.

The time when the prepared repair work cannot be continued is solely due to the missing part.

Conditional calculation scenarios. The assumptions have not been validated against client measurements.

When this solution is relevant

  • Recurrent failure is examined without the used tool, processing mode and previous repair data.
  • The task is ready for work, but the lack of the required node or spare part becomes apparent only after the device has been stopped.

Project scope and implementation

The fault history is linked to the repairs, parts and verification results performed. Production and maintenance teams agree on when the unit can return to work and how this information reaches the planner. The project uses the appropriate features of an existing maintenance module.

Further development options

  • Assessment of the impact of a critical node change on reliability
  • Acceptance of external repair documents

Frequently asked questions

Adapting the solution to your business