Machinery and equipment assembly execution system (MES)
The assembly team receives the set-up of a specific device and records the parts installed and the work done. The master sees the shortcomings and readiness for testing.
The assembly task is noted by the total completion percentage, without naming the rest of the node, operation, and actually replaced part. Further work and testing is prepared according to the inaccurate state of the unit, and the set-up has to be restored before transmission.
How the solution works
- The assembler receives a work instruction approved for the unit and operation.
- The assembly readiness is checked and the components actually installed are recorded.
- The defect or proposed alternative is passed for approval before the basis for enforcement is changed.
- The completed stage, additional work and transfer to the test are recorded at the same unit.
Key challenges
- Production data is recorded too late
Solution capabilities
Preparation of assembly tasks
The workplace sees approved instruction, required components and unfulfilled start conditions.
Actual installation history
The component code, batch or serial number is preserved in the required detail according to the product rules.
Exception and Supplementary Workflow
The amendment request and remake have a validator in charge and separate actual work.
Stage completion approvals
The facts of assembly and programming are transmitted to the next stage with a connection between a specific unit and the version used.
Business context
- Production data is recorded too late
- The assembly task is noted by the total completion percentage, without naming the rest of the node, operation, and actually replaced part. Further work and testing is prepared according to the inaccurate state of the unit, and the set-up has to be restored before transmission.
- The customer's set-up is checked before transfer
- The buyer of an individual machine expects agreed parts, features and tests to be performed. By seeing the progress of assembly of a particular device, missing items can be identified before reception. This allows for more precise matching of the date of transmission and reduces controversy over what is actually prepared.
Core features
- Preparation of assembly tasks
- Actual installation history
- Exception and Supplementary Workflow
- Stage completion approvals
Key integrations
- Enterprise resource planning system (ERP)
- Production orders, material requirements and return of actual data.
- Advanced planning and scheduling system (APS)
- The approved plan and the actual state of execution for replanning.
- Quality management system (QMS)
- Quality states, inspection tasks and detentions.
- Equipment data integration layer
- Reliable process and condition signals linked to the task, operation and time of work.
Potential impact (%)
The ranges indicate an illustrative relative change in the metric under the stated assumptions. Results depend on the starting position and actual use of the solution. Percentages for different metrics must not be added together.
Waiting for collection due to lack of timely showing
6–25%Decreasing
This illustrative scenario assumes that 20-50% of waiting caused by missing information or unclear responsibility can be addressed. That share is assumed to fall by 30-50%. Company data is needed to verify both the addressable share and the resulting change.
The waiting hours for this cause are recorded, separating the delay in supply from the delay in information.
Actual set-up revision work
12–36%Decreasing
This illustrative scenario assumes that 30-60% of manual data entry and handover work can be addressed. That share is assumed to fall by 40-60%. Company data is needed to verify both the addressable workload and the resulting change.
Work is measured by restoring the set up before testing and delivery.
Conditional calculation scenarios. The assumptions have not been validated against client measurements.
When this solution is relevant
- The assembly state is marked as almost complete, although no missing node or no operation has been named.
- The altered part is physically mounted, but old execution information is transmitted to the next workstation.
Project scope and implementation
Assembly workers' workstations can complement the existing production system by handing it the actual set-up and the results of the work. A broader project includes assignment, changes and testing readiness. The management of the design data is compatible with the engineering tools used.
Further development options
- Comparison of additional post-test work by cause
- Verification of unit transfer between collection points