Chemicals and plastics production planning system (APS)

The planner compiles the production queue based on raw materials, equipment, forms and cleaning time. He can assess how the modified plan will affect order deadlines.

The production schedule does not match the product transition, approved cleaning, form and waiting for an intermediate process or study. Nominally, a free line cannot begin the task, and the changed sequence moves the wait to the next stage of production.

How the solution works

  1. Orders are collected, suitable raw materials and available equipment and form states.
  2. The chart applies the transition and storage conditions approved for specific products.
  3. The campaigns are compared and their impact on deadlines, losses, and pending stocks.
  4. The approved plan is transmitted for execution, and a failure or hold-up initiates a new scenario.

Key challenges

  • Planning does not reflect actual production constraints

Solution capabilities

Equipment and Form Capacity

The plan uses appropriate and accessible resources for a specific product.

Product transition rules

A change in color, material or formula has an approved basis for preparation and cleaning.

Intermediate storage and release

When they limit the course, the need for a capacity and waiting for a quality response are assessed.

Comparison of Campaigns

The benefits of the sequence are assessed in conjunction with the delivery time and the margin created by the larger batch.

Business context

Planning does not reflect actual production constraints
The production schedule does not match the product transition, approved cleaning, form and waiting for an intermediate process or study. Nominally, a free line cannot begin the task, and the changed sequence moves the wait to the next stage of production.
The order deadline is checked before it is promised
The quantity desired by the buyer competes for equipment, forms and raw materials with other orders. A plan that evaluates cleanings and production campaigns makes it possible to check the actual date of execution. The seller may discuss options for quantity or delivery while the customer is still matching their purchase.

Core features

  • Equipment and Form Capacity
  • Product transition rules
  • Intermediate storage and release
  • Comparison of Campaigns

Key integrations

Enterprise resource planning system (ERP) / MRP
Orders, needs, supplies and planned receipts of materials.
Chemicals and plastics manufacturing execution system (MES)
Actual status of operations, delays and remaining work.
Warehouse management system (WMS)
Real availability of materials and reservations.
Computerised maintenance management system (CMMS)
Planned maintenance windows and facility inaccessibility.

Potential impact (%)

The ranges indicate an illustrative relative change in the metric under the stated assumptions. Results depend on the starting position and actual use of the solution. Percentages for different metrics must not be added together.

Transition and launch costs

3–14%Decreasing

This illustrative scenario assumes that 15-35% of cost variance can be explained and addressed using the measures described. That share is assumed to fall by 20-40%. Company data is needed to verify both the addressable share and the resulting change.

Comparison of actual work and quantity lost together with change in stock and terms.

Waiting for underestimated intermediate restriction

6–25%Decreasing

This illustrative scenario assumes that 20-50% of waiting caused by missing information or unclear responsibility can be addressed. That share is assumed to fall by 30-50%. Company data is needed to verify both the addressable share and the resulting change.

The waiting resulting from these known conditions and the orders affected by it are measured.

Part of Timely Customer Orders

1–4%Increasing

Sample starting part - 80%. Assumption: 20-40% of the remaining cases involve underestimated conditions of raw materials, forms and cleaning; a solution would help solve 20-40% of these cases.

Time-produced orders are divided by all orders that had to be made during the period being assessed. The later modified deadline does not cancel the initial delay.

Conditional calculation scenarios. The assumptions have not been validated against client measurements.

When this solution is relevant

  • The plan shortens the transition between products without evaluating the approved cleaning, shape or material change.
  • The overall line load does not indicate which orders are held back by ageing, testing or subsequent packaging processing.

Project scope and implementation

The planning project combines constraints on raw materials, shapes, equipment and cleaning. It is possible to expand the planning module used or to develop an additional tool linked to production data. A new wider system is needed when the available environment cannot form a common feasible schedule.

Further development options

  • Comparison of campaign assumptions with actual loss
  • Form change and readiness scenarios

Frequently asked questions

Adapting the solution to your business